Tile Hill, Coventry
Residential









PROJECT OVERVIEW
210 Student rooms student rooms arranged in 29 clusters of either four, six, seven, eight and nine bedrooms – including accessible rooms – with Ensuite facilities. The Student Accommodation will also include a gym, cinema room and bicycle storage.
Full electrical design and build stage 4-7, Inclusive of all specialist’s electrical systems.
- ⦁ LV Distribution
- ⦁ Life safety systems
- ⦁ Containment systems
- ⦁ Small power
- ⦁ Lighting
- ⦁ Emergency lighting
- ⦁ Access control
- ⦁ Intercom
- ⦁ CCTV
- ⦁ Fire alarm
- ⦁ Disabled alarm and Refuge system
- ⦁ Evacuation alert
- ⦁ Data infrastructure
- ⦁ Generator
- ⦁ Solar PV








