Tile Hill, Coventry

Residential

PROJECT OVERVIEW

210 Student rooms student rooms arranged in 29 clusters of either four, six, seven, eight and nine bedrooms – including accessible rooms – with Ensuite facilities. The Student Accommodation will also include a gym, cinema room and bicycle storage.

Full electrical design and build stage 4-7, Inclusive of all specialist’s electrical systems.

  • ⦁ LV Distribution
  • ⦁ Life safety systems
  • ⦁ Containment systems
  • ⦁ Small power
  • ⦁ Lighting
  • ⦁ Emergency lighting
  • ⦁ Access control
  • ⦁ Intercom
  • ⦁ CCTV
  • ⦁ Fire alarm
  • ⦁ Disabled alarm and Refuge system
  • ⦁ Evacuation alert
  • ⦁ Data infrastructure
  • ⦁ Generator
  • ⦁ Solar PV