Moulscoombe Way Brighton

Student Accommodation

PROJECT OVERVIEW

STATUS:

Current

PROJECT:

Student accommodation

VALUE:

£2M

CLIENT:

Hg Construction

A new build containing 280 student rooms, Over 3 Blocks and extensive amenity space areas, Design stage 5-7, Inclusive of all specialist’s electrical systems.

  • ⦁ LV Distribution
  • ⦁ Life safety systems
  • ⦁ Containment systems
  • ⦁ Small power
  • ⦁ Lighting
  • ⦁ Emergency lighting
  • ⦁ Access control
  • ⦁ Intercom
  • ⦁ CCTV
  • ⦁ Fire alarm
  • ⦁ Disabled alarm and Refuge system
  • ⦁ Evacuation alert
  • ⦁ Data infrastructure
  • ⦁ Generator
  • ⦁ Solar PV